<Journal>
				<PublisherName>Payame Noor University (PNU)</PublisherName>
				<JournalTitle>Control and Optimization in Applied Mathematics</JournalTitle>
				<Issn>2383-3130</Issn>
				<Volume></Volume>
				<Issue>Articles in Press</Issue>
				<PubDate PubStatus="epublish">
					<Year>2026</Year>
					<Month>09</Month>
					<Day>15</Day>
				</PubDate>
			</Journal>
<ArticleTitle>Optimization-Oriented Final Construction Cost Forecasting under Price Uncertainty: An Integrated Building Information Modeling and Adaptive Neuro-Fuzzy Inference Framework</ArticleTitle>
<VernacularTitle></VernacularTitle>
			<FirstPage></FirstPage>
			<LastPage></LastPage>
			<ELocationID EIdType="pii">13364</ELocationID>
			
<ELocationID EIdType="doi">10.30473/coam.2026.78960.1445</ELocationID>
			
			<Language>EN</Language>
<AuthorList>
<Author>
					<FirstName>Hossein</FirstName>
					<LastName>Jahangiri</LastName>
<Affiliation>Department of Civil Engineering, Qa.C., Islamic Azad University, Qazvin, Iran</Affiliation>

</Author>
<Author>
					<FirstName>Pooria</FirstName>
					<LastName>Rashvand</LastName>
<Affiliation>Department of Civil Engineering, Qa.C., Islamic Azad University, Qazvin, Iran</Affiliation>

</Author>
<Author>
					<FirstName>Ahmad</FirstName>
					<LastName>Shokouhfar</LastName>
<Affiliation>Department of Civil Engineering, Qa.C., Islamic Azad University, Qazvin, Iran</Affiliation>

</Author>
<Author>
					<FirstName>Reza</FirstName>
					<LastName>Farokhzad</LastName>
<Affiliation>Department of Civil Engineering, Qa.C., Islamic Azad University, Qazvin, Iran</Affiliation>

</Author>
<Author>
					<FirstName>Nima</FirstName>
					<LastName>Amani</LastName>
<Affiliation>Department of Civil Engineering, Cha.C., Islamic Azad University, Chalus, Iran</Affiliation>

</Author>
</AuthorList>
				<PublicationType>Journal Article</PublicationType>
			<History>
				<PubDate PubStatus="received">
					<Year>2026</Year>
					<Month>05</Month>
					<Day>15</Day>
				</PubDate>
			</History>
		<Abstract>Accurate forecasting of final construction costs is important for project planning and cost control in inflation-sensitive construction markets. This study develops a BIM-integrated artificial neural network (ANN) workflow that links item-level Fehrestbaha data and official construction adjustment indices to BIM components and forecasts unit costs at a user-specified completion date. Historical cost information for sixteen materials over 2013--2022 was used to develop the deterministic ANN predictor, and the resulting unit-cost forecasts were returned to the BIM quantity-takeoff workflow. The framework was evaluated on a single nine-story residential building in Tehran by comparing the April 2022 initial estimate, the ANN-based December 2023 forecast, and the actual final project cost. The December 2023 case lies beyond the 2013--2022 historical development horizon and is therefore used as the principal project-level temporal check, whereas the internal training/test diagnostics are interpreted only as model-fit diagnostics because the monthly resampling procedure can induce dependence among adjacent observations. For this case, the absolute project-level deviation was 11.30% for the ANN forecast compared with 23.89% for the initial no-update estimate. The contribution is the automated linkage of national item coding, time-indexed cost information, ANN forecasting, Revit plug-ins, and BIM quantity aggregation rather than a new optimization algorithm or a probabilistic uncertainty model. The results support the feasibility of the workflow as a proof of concept, subject to stricter chronological validation, improved categorical encoding, benchmark comparisons, and multi-project external validation.</Abstract>
		<ObjectList>
			<Object Type="keyword">
			<Param Name="value">Building Information Modeling (BIM)</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">Artificial Neural Network (ANN)</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">Construction cost forecasting</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">Fehrestbaha</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">National adjustment indices</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">Quantity takeoff</Param>
			</Object>
		</ObjectList>